Playtime Palace is a very meaningful asset to the Cranberry community that took the community years to raise the money and design it, but only five days to build it. Over 800 people from the community came out to help build the playground, so for a lot of people the Playtime Palace is much more than a playground but a great memory of past days of their own young children who played on it and after 21 years, their children’s children have played on it. The Playtime Palace was a very unique structure in Western PA and a one of a kind signature piece showing what residents can do to make our community that much better.
The Playtime Palace has served our community well and the tens of thousands of kids that played on it. Even today you can still see parents and children using it but at a less frequent rate than a decade ago. The problem is that the wood over time has split, warped and rotted and many parents stopped using it because of frequency of “splinters” and other concerns for safety. While boards were repaired, replaced, sanded and re-stained yearly, it has been a concern for many years to find a way to replace the structure and do other improvements. One specific safety concern was traffic on Park Road as people using the playground would go between the restroom and the playground. We made Park Road a one-way street, but this also caused certain problems. Other issues are the new rules & mandates associated with playgrounds.
When Cranberry CUP and CTCC decided to make the 2013 Community Project of the Year, the replacement of the Playtime Palace, it was a perfect opportunity to re-create a signature Playground and do so addressing some of the specific concerns associated with the current playground and location. Part of that includes, pushing the playground back further from Park Road, but closer to the current Parking Lot off of Ernie Masuda Drive. Another part is that we will add a rest room near the playground so no one needs to cross Park Road. Plus we can now meet all associated mandates and safety requirement of playgrounds. This playground will be over twice the size of the last playground which reflects the increase of our community population. Best of all we will be re-using a lot of the current Playtime Palace in our new playground. We will incorporate the “Clock Tower” in the entrance design. Some of the foundation posts will be re-used for kids to step on as a small wall and most of the material will be re-used in the outer fence design in the “past section” of the new playground.
Questions:
Why not just replace the boards of Playtime Palace? There obviously is a cost associated with that plus it did not address other issues associated with the playground mentioned above. In addition, money from Cranberry CUP and CTCC was obtained based on building a new playground.
Why wasn’t Playtime Palace maintained? It was maintained on a yearly basis, repaired as needed and re-stained on a yearly basis. The wood after two decades of use and weather has just taken its toll on the playground.
Who made the decision that the Playground needed replaced? Back in 2004, the playground was deemed in need of replacement by Cranberry’s Parks & Recreation Board. It was also cited as in need of replacement in the Cranberry Plan (our 25 year comprehensive Plan) in 2007.
Why am I hearing about it just now? The first announcement that the Playtime Palace was going to be replaced was in June 2011 as the CUP announced that they have decided to take this project on. It was deemed to be the 2013 Project of the Year. The CUP committed $175,000 to the project. In addition the project was in the 2012 CTCC Annual Report sent in June 2012, and also highlighted in CTCC Community Days 20 page planner in July 2012, in which we were asking for volunteers to join the Playground Committee.